![]() |
![]() |
MSF Prep Weekends Need Your Help!
Dear Festers and Friends,
MSF Prep Weekends Need Your Help!
The Pre Weekends are an opportunity to help maintain and improve the Midsummerfest site (which costs about $6000/year to maintain). They provide good exercise, good company, and the satisfaction of helping out MSF, plus you get a discount on your registration. (Students can get an additional discount on their registration if they help out on a Work Weekend.) They're also a great way for newcomers to check out the Hundred Aker Wood (as well as a few of its denizens) to get an idea of whether MSF will be to their taste. People who help on Work Weekends will get first choice of tent-sites and Work Weekend food will be paid for. There will be downtime to enjoy the trails and ponds as well.
Previous Prep Weekends have included clearing out the areas around the ponds, building the outhouse, laying drainage pipe, fixing winter and machinery damage, and a host of maintenance chores.
This year the main areas of focus will be clearing trails and sprucing up the area around the Upper Pond, Deck, Dock, Raft.
If time and money permit, more fun projects can be scheduled. Contact me if you want to suggest anything. (Painting a mural on the outhouse? Building a noise-reducing generator enclosure? Designing and building a new deck for the upper pond? Devising a rope swing for one of the ponds?
The following weekends remain. I'd love to get 2 or 3 weekend scheduled with at least 4 people on each weekend.
June 22-23
June 29-30
July 6-7
July 13-14
July 27-28
August 3-4
If you are interested in volunteering some time for these activities or have comments or ideas, please contact me at idowell@alum.mit.edu or 617-448-9495.
Please look at the next section and let me know when you
can join us. Come check out the place before the main event!
2024: I'd like to do at 2-3 Work Weekends (4 people minimum)
| Who | June 9-15 |
June 22-23 |
June 29-July 2 | July 6-7 |
July 13-14 |
July 27-28 |
August 3-4 |
| Notes | possible extended July 4 stay? | final setup before MSF | |||||
3 |
4 | ||||||
| Ian Dowell | YES |
YES (F-Tu) | |||||
| Kara Krantz | YES |
YES (F-Tu | NO |
NO | |||
| Wil Dowell | YES |
YES | |||||
| Mike Guenette | YES (F-Su) | ||||||
| Carl LaCombe | Maybe (M-Tu) | ||||||
Project |
Accomplished 2024 |
Priority |
To
Do |
Field
Maintenance |
6/9-15 - Kara upper field: mow 1, mow 2; parking area: mow 1; dancing meadow: mow 1; Ian Lower field mow 1, around Barn mow 1; parking area mow 2; parking area 2 mow 1
|
1 |
Cut grass;
whack weeds |
Barn |
6/9-15 - Kara cleaned up and reorganized in Barn, Ian worked on StarLink, set up water pump |
2 |
Organize
and clean as necessary. |
Latrine/Outhouse
maintenance |
|
3 |
|
Clear the trails! |
6/9-15: Ian, Kara, Wil did some clearing on sections of Yellow, Red, and White trails | 4 |
clear all trails; map trails with modern GPS map stone walls and streams with modern GPS |
Upper
Pond Raft |
5 |
Repair and resurface; build ladder | |
| Central Area |
|
Weed whack Wee beach |
|
| Lower Pond | 6/9-15: Ia and Wil cleared a channel through the beaver dam to allow pond level to decrease |
rebuild outlet beaver protection |
|
Road
Maintenance |
6/9-15: Ian cleared two fallen trees |
6 |
remove
obstructions |
Upper
Deck Tarp |
|
retractable
deck tarp fram replace tarp |
|
Upper
Pond Deck |
any necessary repairs, build new deck |
||
Lower
Pond Dock |
fix ramp; stake dock securely | ||
Lay
in Firewood |
Cut,
transport, split, stack, cover |
||
Propane
Shower |
Mount showerhead arm |
||
Info
board |
paint; shingle roof with overhang; add pen holder | ||
Ridge
Trail Blocks |
Put fence across ridge trail access | ||
Waterseal
Barn |
waterseal
the outside |
||
Garden |
6/9-15: Ian cleared ferns |
Even out ground surrounding garden; add topsoil, plant grass; whack weeds | |
Gazebo |
build
a portable, multi purpose gazebo |
||
Rope
Swing |
Rig
a rope swing on one of the ponds |
||
Victorian
Water Slide |
Build a Victorian Water slide | ||
Misc. |
2014: I'd like to do at least 2 Work Weekends (6 people minimum)
| Who | 6/21/2014 |
7/5-7/6/2014 |
7/12-7/13/2014 |
7/19-7/20/2014 |
| Notes | ||||
| 2 |
3 |
2 |
7 |
|
| Ian Dowell | YES |
YES |
YES |
YES |
| Anne Dowell (& Griffin & Tristan) | YES |
YES |
YES |
|
| Mike Guenette | ||||
| Julien Lafleur | ||||
| Meryl Brott & Kevin Shanahan | YES |
|||
| Cinda Lavely (& JJ) | ||||
| Wil Dowell & Henriette Dresens | yes |
YES |
| Project |
Accomplished 2014 |
Priority |
To
Do |
| Field
Maintenance |
7/5 - Gail mowed the fields 7/5-7/6 Ian mowed/whacked the field borders, around barn and garden 7/6 Wil & Henriette mulched the anniversary trees 7/5 Ian & Wil cleared 40' of brush from edge of lower pond 7/5 Ian, Wil & Henriette cleared giant thorn bush from trampoline area 7/5 Ian removed wasp nest from under cabin ramp 7/19 Meryl, Kevin, Ian & Wil cleared brush from around the Lower Pond and the Lower Field 7/18 Gail mowed the fields |
1 |
Cut grass;
whack weeds |
| Barn |
7/5 Ian brought up lumber for solar panel frames 7/6 Ian, Wil & Henriette set up water pump 7/19-20 Anne & Cinda cleaned and organized the Barn 7/19 Cinda worked on the garden and planted a shurb in front of the barn 7/20 Ian set up the rain barrel for fire extinguishing 7/20 Ian built a mounting frame for the solar panels & replaced the battery |
2 |
Organize
and clean as necessary. Set up gravity water feed Install solar panels Deploy pump/water line/power Fix propane space heater |
| Latrine
maintenance |
7/19 Anne cleaned the upper latrine, Cinda cleaned the lower latrine |
3 |
Clean;
repair tarps, splash boards; muck trenches; repair trails to latrines |
| Clear the trails! |
7/19-20 Ian, Wil & Jettie cleared
trails |
4 |
clear all trails; clear around upper pond; clear old stage road map trails with modern GPS |
| Upper
Pond Raft |
7/5 Ian brought up 5 new floatation barrels |
5 |
Repair and resurface; build ladder |
| Central Area | 7/19-20 Wil & Jettie weeded the beach 7/20 Cinda weed whacked |
Weed whack Weed beach |
|
| Road
Maintenance |
7/6 Ian cleared fallen limb |
6 |
remove
obstructions |
| Upper
Deck Tarp |
|
retractable
deck tarp fram replace tarp |
|
| Upper
Pond Deck |
any necessary repairs, build new deck |
||
| Lower
Pond Dock |
7/19 Meryl, Kevin, Ian & Wil - replaced
the damaged barrel and repaired the gangplank |
fix ramp; stake dock securely | |
| Lay
in Firewood |
Cut,
transport, split, stack, cover |
||
| Propane
Shower |
Mount showerhead arm |
||
| Info
board |
paint; shingle roof with overhang; add pen holder | ||
| Ridge
Trail Blocks |
Put fence across ridge trail access | ||
| Waterseal
Barn |
waterseal
the outside |
||
| Garden |
Even out ground surrounding garden; add topsoil, plant grass; whack weeds | ||
| Repair/Replace
the storage Shed |
waterseal
the outside |
||
| Get
the jack pump working |
Finish
repairs; dig pipe trench; mount |
||
| Gazebo |
build
a portable, multi purpose gazebo |
||
| Rope
Swing |
Rig
a rope swing on one of the ponds |
||
| Victorian
Water Slide |
Build a Victorian Water slide | ||
| Misc. |
7/19 Griffin & Ian set up the trampoline |
2012: I'd like to do at least 2 Work Weekends (6 people minimum)
| Who | 5/26-28/2012 |
60/30-7/1/2012 |
7/8-9/2012 |
7/15/2012 |
| Notes | ||||
| 2 |
3 |
4 |
2 |
|
| Ian Dowell (& Griffin & Tristan) | YES |
YES |
YES |
YES |
| Anne Dowell (& Griffin & Tristan) | YES |
YES |
||
| Mike Guenette | YES |
|||
| Julien Lafleur | YES |
|||
| Meryl Brott & Kevin Shanahan | YES |
|||
| Cinda Lavely | YES |
|||
| Wil & Chris Dowell | yes |
yes |
yes |
| Project |
Accomplished 2012 |
Priority |
To
Do |
| Field
Maintenance |
5/26-28 - Chris mowed the fields; Ian trimmed the garden & around
the barn |
1 |
Cut grass;
whack weeds |
| Barn |
5/26-28 - Anne cleaned up in barn |
2 |
Organize
and clean as necessary. |
| Upper
Deck Tarp |
6/30-7/1 - Ian & Kevin put up deck tarp. |
3 |
retractable
deck tarp fram replace tarp |
| Upper
Pond Deck |
6/30-7/1 - Ian & Kevin fixed boards;
Meryl cleared central area |
4 |
any necessary repairs |
| Latrine
maintenance |
6/30-7/1: Meryl & Kevincleaned, cleared, fixed and restocked barn latrine and upper field latrine |
5 |
Clean;
repair tarps, splash boards; muck trenches; repair trails to latrines |
| Upper
Pond Raft |
6 |
Repair and resurface; build ladder | |
| Clear the trails! |
7 |
clear all trails; clear around upper pond; clear old stage road map trails with modern GPS |
|
| Lower
Pond Dock |
fix ramp; stake dock securely | ||
| Lay
in Firewood |
Cut,
transport, split, stack, cover |
||
| Propane
Shower |
Mount showerhead arm |
||
| Info
board |
paint; shingle roof with overhang; add pen holder | ||
| Ridge
Trail Blocks |
Put fence across ridge trail access | ||
| Road
Maintenance |
remove
obstructions |
||
| Waterseal
Barn |
waterseal
the outside |
||
| Garden |
7/15: Cinda weeded and planted in the
garden |
Even out ground surrounding garden; add topsoil, plant grass; whack weeds | |
| Repair/Replace
the storage Shed |
waterseal
the outside |
||
| Get
the jack pump working |
Finish
repairs; dig pipe trench; mount |
||
| Gazebo |
build
a portable, multi purpose gazebo |
||
| Rope
Swing |
Rig
a rope swing on one of the ponds |
||
| Victorian
Water Slide |
Build a Victorian Water slide | ||
| Misc. |
2011: I'd like to do at least 2 Work Weekends (6 people minimum)
| Who |
6/4-5
|
6/25-26
|
7/2-3
|
| Notes | |||
|
2
|
4
|
1
|
|
| Ian Dowell |
YES
|
YES
|
YES
|
| Anne Dowell (& Griffin & Tristan) |
YES
|
YES
|
|
| Mike Guenette | YES
|
||
| Jeremy & JJ Nimmer | YES
|
||
| Cinda Nimmer | YES
|
Maybe
|
|
| Julien Lafleur | Maybe
|
||
| Meryl Brott & Kevin Shanahan |
|
Project
|
Accomplished 2010 |
Priority
|
To
Do
|
|
Field
Maintenance
|
6/4 - Chris mowed the fields; 6/5 - Ian mowed the parking lots |
1
|
Cut grass;
whack weeds |
|
Barn
|
6/25-26 Ian installed pump; Mike & Jeremy built new bonfire circle and cleared overhanging branches; Jeremy cleared brush from garden area; Cinda cleared out garden |
2
|
Organize
and clean as necessary. |
|
Upper
Deck Tarp
|
|
3
|
retractable
deck tarp fram replace tarp |
|
Upper
Pond Dock
|
4
|
any necessary repairs |
|
|
Latrine
maintenance
|
6/25-26: Anne & Ian cleaned, cleared, fixed and restocked upper field latrine |
5
|
Clean;
repair tarps, splash boards; muck trenches; repair trails to latrines
|
|
Upper
Pond Raft
|
6
|
Repair and resurface; build ladder | |
|
Clear the trails! |
7
|
clear
all trails; clear around upper pond; clear old stage road
map trails with modern GPS |
|
|
Lower
Pond Dock
|
fix ramp; stake dock securely | ||
|
Lay
in Firewood
|
Cut,
transport, split, stack, cover
|
||
|
Propane
Shower
|
Mount
showerhead arm
|
||
|
Info
board
|
paint; shingle roof with overhang; add pen holder | ||
|
Ridge
Trail Blocks
|
Put fence across ridge trail access | ||
|
Road
Maintenance
|
remove
obstructions
|
||
|
Waterseal
Barn
|
waterseal
the outside
|
||
|
Garden
|
Even out ground surrounding garden; add topsoil, plant grass; whack weeds | ||
|
Repair/Replace
the storage Shed
|
waterseal
the outside
|
||
|
Get
the jack pump working
|
Finish
repairs; dig pipe trench; mount
|
||
|
Gazebo
|
build
a portable, multi purpose gazebo
|
||
|
Rope
Swing
|
Rig
a rope swing on one of the ponds
|
||
|
Victorian
Water Slide
|
Build a Victorian Water slide | ||
|
Misc.
|
2010: I'd like to do at least 2 Work Weekends (6 people minimum)
| Who |
5/22-23
|
6/19-6/20
|
???
|
7/24-25
|
| Notes | weekend before MSF - feel free to leave stuff in the Barn for MSF | |||
|
2
|
4
|
1
|
1
|
|
| Ian Dowell |
YES
|
YES
|
YES
|
YES
|
| Anne Dowell (& Griffin & Tristan) |
YES
|
YES
|
||
| Mike & Alex Guenette | YES
|
|||
| Brian | ||||
| Meryl Brott & Kevin Shanahan | ||||
| Morton, Sarah | ||||
| Julien Lafleur | ||||
| Anne & Sage Lafleur | ||||
| Todd Radford and Dana Ozik |
|
Project
|
Accomplished 2010 |
Priority
|
To
Do
|
|
Field
Maintenance
|
5/22 - Chris mowed the fields; 5/23 - Ian pushed back the growth at the edges of the upper field and cleared out around the Anniversary trees; Anne mulched the Anniversary trees and planted #8 |
1
|
Cut grass;
whack weeds |
|
Barn
|
5/22 - Ian took measurements for pump installation |
2
|
Organize
and clean as necessary. |
|
Upper
Deck Tarp
|
|
3
|
retractable
deck tarp fram replace tarp |
|
Upper
Pond Dock
|
4
|
any necessary repairs |
|
|
Latrine
maintenance
|
|
5
|
Clean;
repair tarps, splash boards; muck trenches; repair trails to latrines
|
|
Upper
Pond Raft
|
6
|
Repair and resurface; build ladder | |
|
Clear the trails! |
7
|
clear
all trails; clear around upper pond; clear old stage road
map trails with modern GPS |
|
|
Lower
Pond Dock
|
fix ramp; stake dock securely | ||
|
Lay
in Firewood
|
Cut,
transport, split, stack, cover
|
||
|
Propane
Shower
|
Mount
showerhead arm
|
||
|
Info
board
|
paint; shingle roof with overhang; add pen holder | ||
|
Ridge
Trail Blocks
|
Put fence across ridge trail access | ||
|
Road
Maintenance
|
remove
obstructions
|
||
|
Waterseal
Barn
|
waterseal
the outside
|
||
|
Garden
|
Even out ground surrounding garden; add topsoil, plant grass; whack weeds | ||
|
Repair/Replace
the storage Shed
|
waterseal
the outside
|
||
|
Get
the jack pump working
|
Finish
repairs; dig pipe trench; mount
|
||
|
Gazebo
|
build
a portable, multi purpose gazebo
|
||
|
Rope
Swing
|
Rig
a rope swing on one of the ponds
|
||
|
Victorian
Water Slide
|
Build a Victorian Water slide | ||
|
Misc.
|
|
Things to Bring:
|
If you've got them:
|
We'll probably get rained on at some point this weekend, so bring dry clothes.
Here are reports from some of the Work Weekends of years past....
1991
Work Weekend 2
1992
Work Weekend
1
Work
Weekend 2
1993
Work Weekend
1
Work
Weekend 2
Work
Weekend 3
1994
Work Weekend 1
1995
Work Weekend 1
1996
Work Weekend 2
199?
Work Weekend x
1998
Work Weekend 1
2001
Summary
2009: I'd like to do at least 2 Work Weekends (6 people minimum)
| Who |
6/6-7
|
6/20-21
|
7/4-5
|
7/18-19
|
| Notes | weekend before MSF - feel free to leave stuff in the Barn for MSF | |||
|
3
|
4
|
1
|
1
|
|
| Ian Dowell |
YES
|
YES
|
YES
|
YES
|
| Anne Dowell (& Griffin & Tristan) |
YES
|
YES
|
||
| Brian | YES
|
YES
|
||
| Mike & Alex Guenette | YES
|
|||
| Meryl Brott & Kevin Shanahan | ||||
| Morton, Sarah | ||||
| Julien Lafleur | ||||
| Anne & Sage Lafleur | ||||
| Todd Radford and Dana Ozik |
|
Project
|
Accomplished 2009 |
Priority
|
To
Do
|
|
Field
Maintenance
|
Chris mowed the upper and lower fields and dancing meadow; 6/21 Mike worked on the parking areas with the mower (until it stopped working) and weed trimmer |
1
|
Cut grass;
whack weeds |
|
Upper
Deck Tarp
|
|
2
|
retractable deck tarp frame |
|
Upper
Pond Dock
|
3
|
any necessary repairs |
|
|
Latrine
maintenance
|
|
4
|
Clean;
repair tarps, splash boards; muck trenches; repair trails to latrines
|
|
Barn
|
6/20: Mike repaired a couple of warped deck boards; Ian stocked supplies; Anne organized and vacuumed |
5
|
Organize and clean as necessary. |
|
Repair
Theft Damage
|
6/20-21: Mike & Ian drove posts and moved logs to
block the gap in the "wall" near the gate; Ian put a new hasp
on the barn door
|
6
|
any necessary repairs |
|
Upper
Pond Raft
|
7
|
Repair and resurface; build ladder | |
|
Clear the trails! |
6/20: Mike & Ian cleared the Red Triangle trail with
chainsaw, brushcutter and loppers and renewed trail blazes
|
8
|
clear
all trails; clear around upper pond; clear old stage road
|
|
Lower
Pond Dock
|
fix ramp; stake dock securely | ||
|
Lay
in Firewood
|
Cut,
transport, split, stack, cover
|
||
|
Propane
Shower
|
Mount
showerhead arm
|
||
|
Info
board
|
paint; shingle roof with overhang; add pen holder | ||
|
Ridge
Trail Blocks
|
Put fence across ridge trail access | ||
|
Road
Maintenance
|
remove
obstructions
|
||
|
Waterseal
Barn
|
waterseal
the outside
|
||
|
Garden
|
Even out ground surrounding garden; add topsoil, plant grass; whack weeds | ||
|
Repair/Replace
the storage Shed
|
waterseal
the outside
|
||
|
Get
the jack pump working
|
Finish
repairs; dig pipe trench; mount
|
||
|
Gazebo
|
build
a portable, multi purpose gazebo
|
||
|
Rope
Swing
|
Rig
a rope swing on one of the ponds
|
||
|
Victorian
Water Slide
|
Build a Victorian Water slide | ||
|
Misc.
|
2008: I'd like to do at least 2 Work Weekends (6 people minimum)
| Who |
7/12-13
|
7/26-27
|
| Notes |
(Wil & Chris
Dowell & dogs are likely to be there)
|
(Wil & Chris
Dowell & dogs will NOT be there)
|
|
6
|
4
|
|
| Ian Dowell |
YES
|
YES
|
| Anne Dowell | YES
|
|
| Morton, Sarah & Haggis | ||
| Julien Lafleur | YES
|
YES
|
| Anne & Sage Lafleur | YES
|
|
| Mike & Alex Guenette | YES
|
|
| Todd Radford and Dana Ozik | ||
| Meryl Brott & Kevin Shanahan | YES
|
|
Project
|
Accomplished 2008 |
Priority
|
To
Do
|
|
Field
Maintenance
|
7/12-13: Chris mowed the fields; Ian brush mowed the parking area, lower pond approach & field edge |
1
|
Cut grass;
whack weeds |
|
Upper
Deck Tarp
|
7/12-13: Julien, Meryl & Kevin deployed the tarp: it's still in working order |
2
|
retractable deck tarp frame |
|
Upper
Pond Dock
|
7/12-13: Ian painted the new ladder
|
3
|
any necessary repairs |
|
Latrine
maintenance
|
7/12-13: Mike & Kevin scouted locations fore the new Barn Latrine |
4
|
Clean;
repair tarps, splash boards; muck trenches; repair trails to latrines
|
|
Barn
|
7/12-13: Merly, Kevin, Julien, Mike & Alex cleaned and vacuumed 2nd & 3rd levels |
5
|
Organize and clean as necessary. Reapair door; add door gap overlaps |
|
Upper
Pond Raft
|
6
|
Repair and resurface; build ladder | |
|
Lower
Pond Dock
|
fix ramp; stake dock securely | ||
|
Clear the trails! |
7/12-13: everyone did two days of hard work clearing
the 4 major trails and 2/4 minor trails with brush mower, chain saw,
loppers and restored the trail blazes
|
clear
all trails; clear around upper pond; clear old stage road
|
|
|
Lay
in Firewood
|
Cut,
transport, split, stack, cover
|
||
|
Propane
Shower
|
Mount
showerhead arm
|
||
|
Info
board
|
paint; shingle roof with overhang; add pen holder | ||
|
Ridge
Trail Blocks
|
Put fence across ridge trail access | ||
|
Road
Maintenance
|
remove
obstructions
|
||
|
Waterseal
Barn
|
waterseal
the outside
|
||
|
Garden
|
Even out ground surrounding garden; add topsoil, plant grass; whack weeds | ||
|
Repair/Replace
the storage Shed
|
waterseal
the outside
|
||
|
Get
the jack pump working
|
Finish
repairs; dig pipe trench; mount
|
||
|
Gazebo
|
build
a portable, multi purpose gazebo
|
||
|
Rope
Swing
|
Rig
a rope swing on one of the ponds
|
||
|
Victorian
Water Slide
|
Build a Victorian Water slide | ||
|
Misc.
|
2007: I'd like to do at least 2 Work Weekends (6 people minimum)
| Who |
6/16-17
|
6/30-7/1
|
7/14/15
|
| Notes | (Wil & Chris Dowell & dogs are likely to be there) | Weekend before MSF (Chris & dogs possibly there) | |
|
7
|
5
|
1
|
|
| Ian Dowell |
YES
|
YES
|
YES
|
| Anne Dowell |
YES
|
YES
|
|
| Morton, Sarah & Haggis | |||
| Julien Lafleur | YES
|
YES
|
|
| Anne & Sage Lafleur | YES
|
||
| Mike Guenette | YES
|
||
| Carla, Elisabeth & Alex Guenette | |||
| Todd Radford and Dana Ozik | YES
|
||
| Meryl Brott & Kevin Shanahan | YES
|
|
Project
|
Accomplished 2007 |
Priority
|
To
Do
|
|
Field
Maintenance
|
6/16-17: Dana mowed the lower and upper fields, central area, parking lots and barn area; Mike performed extensive lawn mower repairs; Julien whacked around barn, garden and central area 6/30-7/1: Ian did more weed whacking |
1
|
Cut grass;
whack weeds |
|
Upper
Deck Tarp
|
6/16-17: Todd, Dana, Mike, Julien & Ian started the retractable deck tarp frame project - frames have been built and installed and supplied purchased; 6/30-7/1: Julien, Jerry, Jan & Ian got version 1 of the deck tarp up |
2
|
retractable deck tarp frame |
|
Upper
Pond Dock
|
3
|
any necessary repairs |
|
|
Latrine
maintenance
|
6/30-7/1:
Meryl & Kevin cleaned, moved and refurbished the barn and upper
pond latrines |
4
|
Clean;
repair tarps, splash boards; muck trenches; repair trails to latrines
|
|
Upper
Pond Raft
|
6/16-17:
Todd & Dana tightened up the ropes
|
5
|
Repair and resurface; build ladder |
|
Lower
Pond Dock
|
fix ramp; stake dock securely | ||
|
Clear the trails! |
clear
all trails; clear around upper pond; clear old stage road
|
||
|
Lay
in Firewood
|
Cut,
transport, split, stack, cover
|
||
|
Barn
|
6/16-17: Anne, Anne, Dana & Todd cleaned and organized; Todd, Dana & Ian installed safety nets on stairs 6/30-7/1: Anne, Meryl & Kevin cleaned, organized and inventoried; Kevin & Meryl cleaned and filled lanterns and tiki torches |
Organize and clean as necessary. Reapair door; add door gap overlaps | |
|
Propane
Shower
|
6/30-7/1:
Ian hooked up propane shower; Meryl & Anne scouted locations in
the central area
|
Mount
showerhead arm
|
|
|
Info
board
|
paint; shingle roof with overhang; add pen holder | ||
|
Ridge
Trail Blocks
|
Put fence across ridge trail access | ||
|
Road
Maintenance
|
remove
obstructions
|
||
|
Waterseal
Barn
|
waterseal
the outside
|
||
|
Garden
|
Even out ground surrounding garden; add topsoil, plant grass; whack weeds | ||
|
Repair/Replace
the storage Shed
|
waterseal
the outside
|
||
|
Get
the jack pump working
|
Finish
repairs; dig pipe trench; mount
|
||
|
Gazebo
|
build
a portable, multi purpose gazebo
|
||
|
Rope
Swing
|
Rig
a rope swing on one of the ponds
|
||
|
Victorian
Water Slide
|
Build a Victorian Water slide | ||
|
Misc.
|
I'd like to do 2 July Work Weekends (6 people minimum)
| Who | 5/29-5/30 |
7/15-7/16 |
7/22-7/23 |
| Notes | |||
5 |
3.5 |
||
| Ian Dowell | YES |
YES |
YES |
| Anne Dowell | YES |
YES |
|
| Morton, Sarah & Haggis | |||
| Eva Beuling | YES |
||
| Julien, Anne & Sage Lafleur | YES |
YES |
|
| Cinda Lavely & Jeremy Nimmer | YES |
||
| Mike & Elisabeth Guenette | YES |
||
| Carla & Alex Guenette | |||
| Todd Radford and Dana Ozik | YES |
||
| Meryl Brott & Kevin Shanahan |
| Project |
Accomplished |
Priority |
To
Do |
| Field
Maintenance |
7/15-16: Dana, Todd & Julien mowed; Ian & Todd weed whacked; Todd, Dana, Julien & Ian cleared & moved fallen trees |
1 |
Cut grass;
whack weeds |
| Upper
Pond Dock |
7/15-16:
Todd fixed the buckled boards |
2 |
any necessary repairs |
| Latrine
maintenance |
7/15-16:
Ian cleaned the upper latrine; Todd, Dana, Julien & Ian cleared
& moved upper latrine and lined path |
3 |
Clean;
repair tarps, splash boards; muck trenches; repair trails to latrines |
| Upper
Pond Raft |
7/15-16:
Todd, Dana & Julien refurbished the surface and supports |
4 |
Repair and resurface; build ladder |
| Lower
Pond Dock |
5 |
fix ramp; stake dock securely | |
| Upper
Deck Tarp |
6 |
rig roll-out tarp | |
| Clear the trails! |
7 |
clear all trails; clear around upper pond; clear old stage road |
|
| Lay
in Firewood |
8 |
Cut,
transport, split, stack, cover |
|
| Repair
Weathervane |
7/15-16:
Todd & Julien removed and replaced the weathervane and corrected
the E/W directionals; Steve Kondi soldered the broken pieces back on |
9 |
take
down weathervane, correct compass, fix owl, fix CR |
| Barn |
7/15-16: Anne & Anne cleaned and organized |
10 |
Organize and clean as necessary. Reapir door. |
| Propane
Shower |
11 |
Mount showerhead arm |
|
| Info
board |
12 |
paint; shingle roof with overhang; add pen holder | |
| Ridge
Trail Blocks |
13 |
Put fence across ridge trail access | |
| Road
Maintenance |
7/15-16:
Todd, Dana, Julien & Ian cleared obstructions from road |
waterseal
the outside |
|
| Waterseal
Barn |
waterseal
the outside |
||
| Garden |
7/15-16:
Ian & Todd whacked weeds |
Even out ground surrounding garden; add topsoil, plant grass; whack weeds | |
| Repair/Replace
the storage Shed |
waterseal
the outside |
||
| Get
the jack pump working |
Finish
repairs; dig pipe trench; mount |
||
| Gazebo |
build
a portable, multi purpose gazebo |
||
| Rope
Swing |
Rig
a rope swing on one of the ponds |
||
| Victorian
Water Slide |
Build a Victorian Water slide | ||
| Misc. |
7/15-16:
Ian fixed the rain barrel; Todd & Ian hung the bat |
| Project |
Accomplished |
Priority |
To
Do |
| Field
Maintenance |
6/26/05:
Ian & Morton fixed the mower (twice). Ian & Eva stocked up
on gas. Eva whacked weeks. Sarah, Gavin & Karen mowed the fields. |
1 |
Cut grass;
whack weeds |
| Combat
Beavers |
|
2 |
Unclog pond outlets as necessary; build wire fence to keep beavers away; |
| Latrine
maintenance |
6/26/05:
Anne worked on the Barn latrine |
3 |
Clean;
repair tarps, splash boards; muck trenches; repair trails to latrines |
| Lower
Pond Dock |
4 |
fix ramp; stake dock securely | |
| Upper
Pond Dock |
5 |
any necessary repairs | |
| Upper
Pond Raft |
6 |
Repair and resurface; build ladder | |
| Barn |
6/26/05:
Anne D.took inventory of cooking implements. Ian and Morton made a
temporary fix to the barn door which had come off the hinges. Gavin
hauled up the new grill |
7 |
Organize and clean as necessary. Reapir door. |
| Info
board |
8 |
paint; shingle roof with overhang; add pen holder | |
| Upper
Deck Tarp |
9 |
rig roll-out tarp | |
| Clear the trails! |
10 |
clear all trails; clear around upper pond; clear old stage road |
|
| Lay
in Firewood |
6/26/05:
Morton and Ian removed fallen timber from the road and cut up additional
timber. Morton and Eva hauled the logs to the barn. |
11 |
Cut,
transport, split, stack, cover |
| Ridge
Trail Blocks |
Put fence across ridge trail access | ||
| Waterseal
Barn |
waterseal
the outside |
||
| Garden |
Even out ground surrounding garden; add topsoil, plant grass; whack weeds | ||
| Propane
Shower |
Mount showerhead arm; repair shower |
||
| Repair/Replace
the storage Shed |
waterseal
the outside |
||
| Repair
Weathervane |
take
down weathervane, correct compass, fix owl, fix CR |
||
| Get
the jack pump working |
Finish
repairs; dig pipe trench; mount |
||
| Gazebo |
build
a portable, multi purpose gazebo |
||
| Rope
Swing |
Rig
a rope swing on one of the ponds |
||
| Victorian
Water Slide |
Build a Victorian Water slide |
|
Project
|
Accomplished |
Priority
|
To
Do
|
|
Field
Maintenance
|
5/29-30:
Ian & Mike repaired mowers, trimmer, mantis & generator; mowed
upper field with the push mower, dancing meadow, garden, barn front |
1
|
Cut grass;
whack weeds |
|
Combat
Beavers
|
5/23:
Ian unclogged pond outlets of beaver debris |
2
|
Unclog pond outlets as necessary; build wire fence to keep beavers away; |
|
Latrine
maintenance
|
7/17:
Anne L. & Elisabeth inspected, Bill G. weedwhacked |
3
|
Clean;
repair tarps, splash boards; muck trenches; repair trails to latrines
|
|
Lower
Pond Dock
|
4
|
fix ramp; stake dock securely | |
|
Upper
Pond Dock
|
7/17:
Ian removed wasp nest and renailed step board
|
5
|
Fix loose cross piece |
|
Upper
Pond Raft
|
7/17:
Ian & Bill G. replaced leaking barrel and hammered in loose nails
|
6
|
Repair |
|
Barn
|
7/17:
Anne L. directed cleanup of 2nd and 3rd levels with help of Elisabeth,
Julien, Carol, Mike; Julien & Mike fixed up pews; moved one pew
section to 1st level
|
7
|
Organize |
|
Info
board
|
7/17:
Mike built with help from Ian & Julien
|
8
|
build
sheltered info board with chalk board, cork board, plexi shield, roof,
removeable
|
|
Upper
Deck Tarp
|
9
|
rig roll-out tarp | |
|
Clear the trails! |
10
|
Clear Yellow Diamond (initial), White Diamond (repair), White Triangle
(initial - new), Yellow Diamond (initial) and Yellow Triangle (initial
- new) trails; clear around upper pond; clear old stage road
|
|
|
Lay
in Firewood
|
11
|
Cut,
transport, split, stack, cover
|
|
|
Ridge
Trail Blocks
|
Put fence across ridge trail access | ||
|
Waterseal
Barn
|
Wil,
Marjolijn & Eva B. watersealed 2nd floor deck floor
|
waterseal
the outside
|
|
|
Garden
|
7/17:
Bill G. weedwhacked around garden
|
Even out ground surrounding garden; add topsoil, plant grass; whack weeds | |
|
Propane
Shower
|
Mount showerhead arm
|
||
|
Repair/Replace
the storage Shed
|
waterseal
the outside
|
||
|
Repair
Weathervane
|
take
down weathervane, correct compass, fix owl
|
||
|
Get
the jack pump working
|
Finish
repairs; dig pipe trench; mount
|
||
|
Gazebo
|
build
a portable, dual purpose gazebo
|
||
|
Rope
Swing
|
Rig
a rope swing on one of the ponds
|
||
|
Victorian
Water Slide
|
Build a Victorian Water slide |
|
Project
|
Accomplished |
Priority
|
To
do
|
|
Latrine
maintenance
|
6/29-30:
Gavin dug a new latrine by the cabin
7/6-7: Anne cleared, cleaned and refreshed the upper and barn latrines 7/13-14: Anne & Jacqueline finished the cleaning and refurbishing of latrines; Anne & Ian did additional landscaping, including adding a platform outside the upper latrine |
1
|
Clean;
repair tarps, splash boards; muck trenches; repair trails to latrines
|
|
Build
a new Dock
|
6/22-23:
Sarah, Morton, Jason & Chris hauled out the old docks, attached
the new dock to the deck, determined it needs support posts, designed
a plan to salvage old dock material |
2
|
mount barrels in frame, reinforce frame, attach frame to Deck; Possible
second Dock segment
|
|
Clear the trails! |
6/29-30:
Ian bulldozed the orange diamond trail; Ian, Anne, Mike & Joceline
did light clearing on the Yellow Diamond and Yellow Triangle trails.
Mike & Ian started on the upper pond.
7/13-14: Ian did more work clearing trail around the upper pond |
3
|
Clear Yellow Diamond (initial), White Diamond (repair), White Triangle
(initial - new), Yellow Diamond (initial) and Yellow Triangle (initial
- new) trails; clear around upper pond
|
|
Propane
Shower
|
4
|
Mount showerhead arm
|
|
|
Organize
the Barn
|
6/22-23:
Anne directed clean-up from winter damage and wear; Cinda, Sarah, Morton
& Jason helped clean and organize
|
5
|
clean
and organize all levels;
|
|
Repair/Replace
the storage Shed
|
6
|
waterseal
the outside; put wire around bottom to keep out porkies
|
|
|
Fix
the Barn drainage/access
|
6/29-30:
Ian had gravel delivered & used heavy machinery to move it inside
barn. Mike, Anne, Elisabeth & Joceline raked it even. Anne, Mike,
Joceline & Elisabeth moved everything out of the first level of
the barn. A, I, M, E, J sorted through it and moved most of it back
in organized and cleaned.
|
7
|
Have gravel delivered and spread inside barn
|
|
Get
the jack pump working
|
Finish
repairs; dig pipe trench; mount
|
||
|
Field
Maintenance
|
6/1-2:
Wil & Chris mowed fields |
Cut
grass; whack weeds
|
|
|
Lay
in Firewood
|
7/13-14:
Ian chopped up and stacked long firewood by wood pile
|
Cut,
transport, split, stack, cover
|
|
| Clear Deadfalls | 6/22-23:
Ian, Anne, Sally & Chris tooke down the large poplar branch which
fell across the road last fall; cut up for firewood 7/13-14: Ian cut up the big deadfall across the latrine trail |
Remove fallen trees | |
|
Garden
|
6/22-23:Cinda
weeded the garden and started working on the oval at the side of the
barn;
6/29-30: Ian weed-whacked the area around the garden & cut a few overhangs 7/6-7: Cinda worked on the garden |
Even out ground surrounding garden; add topsoil, plant grass; whack weeds | |
| Odds & Ends | 6/22-23:Jason
cleared sticks & debris from road; Chris & Wil brought up Chruch
pews; Ian, Anne, Sally, Chris, Chris & Wil hauled them in to barn; 6/29-30: Ian moved gravel down to the lower pond outlet; Ian & Wil raked it smooth; Ian, Anne & Joceline raked the disturbed gravel in front of the barn; Wil raked the divots in the road left from the machinery. Chris & Ian worked on the deck of the Shack; Chris, Wil & Gavin worked on the Dock of the Shack. Wil build a fireplace at the Shack. 7/6-7: Ian & Jason erected 3 standing stones 7/6-7: Sarah fixed the screen door on the 1st floor of the cabin 7/13-14: Jacqeuline & Ian replaced two barrels on the upper raft & anchored the raft in the middle of the pond 7/13-14: Anne, Jacqueline & Ian cleared brush & scrap wood from the central area and put a new top on the picnic table |
Stabilize dock on lower pond; fix road; put new top on deck table; add rain barrel under gutter; | |
|
Combat
Beavers
|
6/22-23:
Ian unclogged upper and lower pond outlets where beavers have repeatedly
dammed up the flow and threatened to wash out the dams
6/29-30: Ian unclogged upper & lower pond outlets 7/1: Chris put wire cages around pond outlets |
Unclog pond outlets as necessary; build wire fence to keep beavers away; |
|
June 16-17 |
To do | ||
|
Clear the trails! |
Cleared (initial clearing) Orange Diamond and Red Triangle trails | 7. Clear Yellow Diamond (initial), White Diamond (repair), White Triangle (initial - new), Yellow Diamond (initial) and Yellow Triangle (initial - new) trails | |
| Build a new Dock | Assembled frame and decking | 1. Get barrels, mount in frame, reinforce frame, attach frame to Deck; Possible second Dock segment | |
| Repair/Replace the storage Shed | Took off roof, cleared out interior, built new shed frame/roof | 2. Take apart the rest of the old Shed, use metal for sides/roof of new Shed | |
| Fix the Barn drainage/access | Put wire/gravel around base of Barn | 8. Spread remaining gravel around area in front of Barn | |
| Finish the shower | 4. Mount shower curtain hardware | ||
| Refurbish/repair barbecue grill | Cut out grill from base | 10. Fix up and mount base, if possible | |
| Latrine maintenance | 3. Clean; repair tarps, splash boards; muck trenches | ||
| Refurbish the Deck | 5. Repair/replace seats | ||
| Organize the Barn | Cleared out/organized 1st level; swept 2nd level; added carpet and couch/bed frame to 3rd level; added theater seats to 2nd level | 6. Deal with stuff from Shed; organize 2nd & 3rd levels | |
| Get the jack pump working | 9. Finish repairs; dig pipe trench; mount |