Midsummerfest/KIDsummerfest Work Weekends


MSF Prep Weekends Need Your Help!

Dear Festers and Friends,


MSF Prep Weekends Need Your Help!


The Pre Weekends are an opportunity to help maintain and improve the Midsummerfest site (which costs about $6000/year to maintain). They provide good exercise, good company, and the satisfaction of helping out MSF, plus you get a discount on your registration. (Students can get an additional discount on their registration if they help out on a Work Weekend.) They're also a great way for newcomers to check out the Hundred Aker Wood (as well as a few of its denizens) to get an idea of whether MSF will be to their taste. People who help on Work Weekends will get first choice of tent-sites and Work Weekend food will be paid for. There will be downtime to enjoy the trails and ponds as well.


Previous Prep Weekends have included clearing out the areas around the ponds, building the outhouse, laying drainage pipe, fixing winter and machinery damage, and a host of maintenance chores.


This year the main areas of focus will be clearing trails and sprucing up the area around the Upper Pond, Deck, Dock, Raft.


If time and money permit, more fun projects can be scheduled. Contact me if you want to suggest anything. (Painting a mural on the outhouse?  Building a noise-reducing generator enclosure?  Designing and building a new deck for the upper pond?  Devising a rope swing for one of the ponds?


The following weekends remain.  I'd love to get 2 or 3 weekend scheduled with at least 4 people on each weekend.


June 22-23

June 29-30

July 6-7

July 13-14

July 27-28

August 3-4


If you are interested in volunteering some time for these activities or have comments or ideas, please contact me at idowell@alum.mit.edu or 617-448-9495.





Please look at the next section and let me know when you can join us. Come check out the place before the main event!

back to top

 


2024: I'd like to do at 2-3 Work Weekends (4 people minimum)
Who
June 9-15
June 22-23
June 29-July 2
July 6-7
July 13-14
July 27-28
August 3-4
Notes
  possible extended July 4 stay?  
final setup before MSF
 
3
4
 
 
Ian Dowell
YES
YES (F-Tu)
 
 
Kara Krantz
YES
YES (F-Tu
NO
NO
 
Wil Dowell
YES
YES
 
 
Mike Guenette
YES (F-Su)
 
 
Carl LaCombe
Maybe (M-Tu)
 
 
           
 
 
 
 
 
Project

Accomplished 2024

Priority
To Do
Field Maintenance

6/9-15 - Kara upper field: mow 1, mow 2; parking area: mow 1; dancing meadow: mow 1; Ian Lower field mow 1, around Barn mow 1; parking area mow 2; parking area 2 mow 1

 

1

Cut grass; whack weeds
-parking areas
-barn front
-garden
-central area
-dancing meadow
-upper field
-lower field

-latrine paths

Barn

6/9-15 - Kara cleaned up and reorganized in Barn, Ian worked on StarLink, set up water pump

2

Organize and clean as necessary.
Build loft

Latrine/Outhouse maintenance

 

3

Clear the trails!

6/9-15: Ian, Kara, Wil did some clearing on sections of Yellow, Red, and White trails
4
clear all trails;
map trails with modern GPS

map stone walls and streams with modern GPS
Upper Pond Raft
5
Repair and resurface; build ladder
Central Area

 

 

Weed whack

Wee beach

Lower Pond

6/9-15: Ia and Wil cleared a channel through the beaver dam to allow pond level to decrease

 

rebuild outlet beaver protection

Road Maintenance
6/9-15: Ian cleared two fallen trees
6
remove obstructions
Upper Deck Tarp

 

retractable deck tarp fram
replace tarp

Upper Pond Deck

any necessary repairs, build new deck

Lower Pond Dock
fix ramp; stake dock securely
Lay in Firewood
Cut, transport, split, stack, cover
Propane Shower
Mount showerhead arm
Info board
paint; shingle roof with overhang; add pen holder
Ridge Trail Blocks
Put fence across ridge trail access
Waterseal Barn
waterseal the outside
Garden
6/9-15: Ian cleared ferns
Even out ground surrounding garden; add topsoil, plant grass; whack weeds
Gazebo
build a portable, multi purpose gazebo
Rope Swing
Rig a rope swing on one of the ponds
Victorian Water Slide
Build a Victorian Water slide
Misc.

 


2014: I'd like to do at least 2 Work Weekends (6 people minimum)
Who
6/21/2014
7/5-7/6/2014
7/12-7/13/2014
7/19-7/20/2014
Notes
 
 
2
3
2
7
Ian Dowell
YES
YES
YES
YES
Anne Dowell (& Griffin & Tristan)
YES
YES
YES
Mike Guenette
Julien Lafleur
Meryl Brott & Kevin Shanahan
YES
Cinda Lavely (& JJ)      
Wil Dowell & Henriette Dresens
yes
YES
Project

Accomplished 2014

Priority
To Do
Field Maintenance

7/5 - Gail mowed the fields

7/5-7/6 Ian mowed/whacked the field borders, around barn and garden

7/6 Wil & Henriette mulched the anniversary trees

7/5 Ian & Wil cleared 40' of brush from edge of lower pond

7/5 Ian, Wil & Henriette cleared giant thorn bush from trampoline area

7/5 Ian removed wasp nest from under cabin ramp

7/19 Meryl, Kevin, Ian & Wil cleared brush from around the Lower Pond and the Lower Field

7/18 Gail mowed the fields

1

Cut grass; whack weeds
-parking areas
-barn front
-garden
-central area
-dancing meadow
-upper field
-lower field

-latrine paths

Barn

7/5 Ian brought up lumber for solar panel frames

7/6 Ian, Wil & Henriette set up water pump

7/19-20 Anne & Cinda cleaned and organized the Barn

7/19 Cinda worked on the garden and planted a shurb in front of the barn

7/20 Ian set up the rain barrel for fire extinguishing

7/20 Ian built a mounting frame for the solar panels & replaced the battery

2

Organize and clean as necessary.
Build loft
Fix weathervane

Set up gravity water feed

Install solar panels

Deploy pump/water line/power

Fix propane space heater

Latrine maintenance

7/19 Anne cleaned the upper latrine, Cinda cleaned the lower latrine

3
Clean; repair tarps, splash boards; muck trenches; repair trails to latrines

Clear the trails!

7/19-20 Ian, Wil & Jettie cleared trails
4
clear all trails; clear around upper pond; clear old stage road
map trails with modern GPS
Upper Pond Raft
7/5 Ian brought up 5 new floatation barrels
5
Repair and resurface; build ladder
Central Area

7/19-20 Wil & Jettie weeded the beach

7/20 Cinda weed whacked

 

Weed whack

Weed beach

Road Maintenance
7/6 Ian cleared fallen limb
6
remove obstructions
Upper Deck Tarp

 

retractable deck tarp fram
replace tarp

Upper Pond Deck

any necessary repairs, build new deck

Lower Pond Dock
7/19 Meryl, Kevin, Ian & Wil - replaced the damaged barrel and repaired the gangplank
fix ramp; stake dock securely
Lay in Firewood
Cut, transport, split, stack, cover
Propane Shower
Mount showerhead arm
Info board
paint; shingle roof with overhang; add pen holder
Ridge Trail Blocks
Put fence across ridge trail access
Waterseal Barn
waterseal the outside
Garden
Even out ground surrounding garden; add topsoil, plant grass; whack weeds
Repair/Replace the storage Shed
waterseal the outside
Get the jack pump working
Finish repairs; dig pipe trench; mount
Gazebo
build a portable, multi purpose gazebo
Rope Swing
Rig a rope swing on one of the ponds
Victorian Water Slide
Build a Victorian Water slide
Misc.
7/19 Griffin & Ian set up the trampoline

 


2012: I'd like to do at least 2 Work Weekends (6 people minimum)
Who
5/26-28/2012
60/30-7/1/2012
7/8-9/2012
7/15/2012
Notes
 
 
2
3
4
2
Ian Dowell (& Griffin & Tristan)
YES
YES
YES
YES
Anne Dowell (& Griffin & Tristan)
YES
YES
Mike Guenette
YES
Julien Lafleur
YES
Meryl Brott & Kevin Shanahan
YES
Cinda Lavely      
YES
Wil & Chris Dowell
yes
yes
yes
Project

Accomplished 2012

Priority
To Do
Field Maintenance

5/26-28 - Chris mowed the fields; Ian trimmed the garden & around the barn
6/30-7/1 - Ian, Meryl & Kevin trimmed central area, latrine paths, field boundaries, part of barn area (mower broken)
7/14 Kondis mowed the fields (mower still broken)

1

Cut grass; whack weeds
-parking areas
-barn front
-garden
-central area
-dancing meadow
-upper field
-lower field

-latrine paths

Barn

5/26-28 - Anne cleaned up in barn

2

Organize and clean as necessary.
Add railings to front steps
Build loft
Measure rise & run for water pump
Lay pump hose
Install pump
Fix weathervane

Upper Deck Tarp

6/30-7/1 - Ian & Kevin put up deck tarp.

3
retractable deck tarp fram
replace tarp

Upper Pond Deck
6/30-7/1 - Ian & Kevin fixed boards; Meryl cleared central area
4

any necessary repairs

Latrine maintenance

6/30-7/1: Meryl & Kevincleaned, cleared, fixed and restocked barn latrine and upper field latrine

5
Clean; repair tarps, splash boards; muck trenches; repair trails to latrines
Upper Pond Raft
6
Repair and resurface; build ladder

Clear the trails!

7
clear all trails; clear around upper pond; clear old stage road
map trails with modern GPS
Lower Pond Dock
fix ramp; stake dock securely
Lay in Firewood
Cut, transport, split, stack, cover
Propane Shower
Mount showerhead arm
Info board
paint; shingle roof with overhang; add pen holder
Ridge Trail Blocks
Put fence across ridge trail access
Road Maintenance
remove obstructions
Waterseal Barn
waterseal the outside
Garden
7/15: Cinda weeded and planted in the garden
Even out ground surrounding garden; add topsoil, plant grass; whack weeds
Repair/Replace the storage Shed
waterseal the outside
Get the jack pump working
Finish repairs; dig pipe trench; mount
Gazebo
build a portable, multi purpose gazebo
Rope Swing
Rig a rope swing on one of the ponds
Victorian Water Slide
Build a Victorian Water slide
Misc.

 

 


2011: I'd like to do at least 2 Work Weekends (6 people minimum)
Who
6/4-5
6/25-26
7/2-3
Notes
 
 
2
4
1
Ian Dowell
YES
YES
YES
Anne Dowell (& Griffin & Tristan)
YES
YES
 
Mike Guenette
YES
 
Jeremy & JJ Nimmer
YES
 
Cinda Nimmer
YES
Maybe
Julien Lafleur
Maybe
Meryl Brott & Kevin Shanahan
Project

Accomplished 2010

Priority
To Do
Field Maintenance

6/4 - Chris mowed the fields; 6/5 - Ian mowed the parking lots
6/25-26 Chris mowed fields, Ian mowed lots; Ian cut back brush around upper field, lower bonfire circle, latrine paths. Anne & Ian planted their 8th anniversary tree (a pink diamond hyrangea)

1

Cut grass; whack weeds
-parking areas
-barn front
-garden
-central area
-dancing meadow
-upper field
-lower field

-latrine paths

Barn

6/25-26 Ian installed pump; Mike & Jeremy built new bonfire circle and cleared overhanging branches; Jeremy cleared brush from garden area; Cinda cleared out garden

2

Organize and clean as necessary.
Add railings to front steps
Build loft
Measure rise & run for water pump
Lay pump hose
Install pump
Fix weathervane

Upper Deck Tarp

 

3
retractable deck tarp fram
replace tarp

Upper Pond Dock
4

any necessary repairs

Latrine maintenance

6/25-26: Anne & Ian cleaned, cleared, fixed and restocked upper field latrine

5
Clean; repair tarps, splash boards; muck trenches; repair trails to latrines
Upper Pond Raft
6
Repair and resurface; build ladder

Clear the trails!

7
clear all trails; clear around upper pond; clear old stage road
map trails with modern GPS
Lower Pond Dock
fix ramp; stake dock securely
Lay in Firewood
Cut, transport, split, stack, cover
Propane Shower
Mount showerhead arm
Info board
paint; shingle roof with overhang; add pen holder
Ridge Trail Blocks
Put fence across ridge trail access
Road Maintenance
remove obstructions
Waterseal Barn
waterseal the outside
Garden
Even out ground surrounding garden; add topsoil, plant grass; whack weeds
Repair/Replace the storage Shed
waterseal the outside
Get the jack pump working
Finish repairs; dig pipe trench; mount
Gazebo
build a portable, multi purpose gazebo
Rope Swing
Rig a rope swing on one of the ponds
Victorian Water Slide
Build a Victorian Water slide
Misc.

 


 

2010: I'd like to do at least 2 Work Weekends (6 people minimum)
Who
5/22-23
6/19-6/20
???
7/24-25
Notes
  weekend before MSF - feel free to leave stuff in the Barn for MSF
 
2
4
1
1
Ian Dowell
YES
YES
YES
YES
Anne Dowell (& Griffin & Tristan)
YES
YES
   
Mike & Alex Guenette
YES
   
Brian
   
Meryl Brott & Kevin Shanahan
   
Morton, Sarah
   
Julien Lafleur
   
Anne & Sage Lafleur
   
Todd Radford and Dana Ozik
   
Project

Accomplished 2010

Priority
To Do
Field Maintenance

5/22 - Chris mowed the fields; 5/23 - Ian pushed back the growth at the edges of the upper field and cleared out around the Anniversary trees; Anne mulched the Anniversary trees and planted #8

1

Cut grass; whack weeds
-parking areas
-barn front
-garden
-central area
-dancing meadow
-upper field
-lower field

-latrine paths

Barn

5/22 - Ian took measurements for pump installation

2

Organize and clean as necessary.
Add railings to front steps
Build loft
Measure rise & run for water pump
Lay pump hose
Install pump

Upper Deck Tarp

 

3
retractable deck tarp fram
replace tarp

Upper Pond Dock
4

any necessary repairs

Latrine maintenance

 

5
Clean; repair tarps, splash boards; muck trenches; repair trails to latrines
Upper Pond Raft
6
Repair and resurface; build ladder

Clear the trails!

7
clear all trails; clear around upper pond; clear old stage road
map trails with modern GPS
Lower Pond Dock
fix ramp; stake dock securely
Lay in Firewood
Cut, transport, split, stack, cover
Propane Shower
Mount showerhead arm
Info board
paint; shingle roof with overhang; add pen holder
Ridge Trail Blocks
Put fence across ridge trail access
Road Maintenance
remove obstructions
Waterseal Barn
waterseal the outside
Garden
Even out ground surrounding garden; add topsoil, plant grass; whack weeds
Repair/Replace the storage Shed
waterseal the outside
Get the jack pump working
Finish repairs; dig pipe trench; mount
Gazebo
build a portable, multi purpose gazebo
Rope Swing
Rig a rope swing on one of the ponds
Victorian Water Slide
Build a Victorian Water slide
Misc.

 

 

back to top


Things to Bring:

  • sleeping bag
  • pillow
  • towel
  • bathing suit

If you've got them:

  • work gloves
  • work boots
  • eye protection
  • cordless drill/screwdriver
  • cordless circular saw
  • pruning/clipping tools
  • water shoes

We'll probably get rained on at some point this weekend, so bring dry clothes.

back to top



Here are reports from some of the Work Weekends of years past....

1991
Work Weekend 2

1992
Work Weekend 1

Work Weekend 2

1993
Work Weekend 1

Work Weekend 2
Work Weekend 3

1994
Work Weekend 1

1995
Work Weekend 1

1996
Work Weekend 2

199?
Work Weekend x

1998
Work Weekend 1

2001
Summary

back to top


2009: I'd like to do at least 2 Work Weekends (6 people minimum)
Who
6/6-7
6/20-21
7/4-5
7/18-19
Notes
  weekend before MSF - feel free to leave stuff in the Barn for MSF
 
3
4
1
1
Ian Dowell
YES
YES
YES
YES
Anne Dowell (& Griffin & Tristan)
YES
YES
   
Brian
YES
YES
   
Mike & Alex Guenette
YES
   
Meryl Brott & Kevin Shanahan
   
Morton, Sarah
   
Julien Lafleur
   
Anne & Sage Lafleur
   
Todd Radford and Dana Ozik
   
Project

Accomplished 2009

Priority
To Do
Field Maintenance

Chris mowed the upper and lower fields and dancing meadow; 6/21 Mike worked on the parking areas with the mower (until it stopped working) and weed trimmer

1

Cut grass; whack weeds
-parking areas
-barn front
-garden
-central area
-dancing meadow
-upper field
-lower field

-latrine paths

Upper Deck Tarp

 

2
retractable deck tarp frame
Upper Pond Dock
3

any necessary repairs

Latrine maintenance

 

4
Clean; repair tarps, splash boards; muck trenches; repair trails to latrines
Barn

6/20: Mike repaired a couple of warped deck boards; Ian stocked supplies; Anne organized and vacuumed

5
Organize and clean as necessary.
Repair Theft Damage
6/20-21: Mike & Ian drove posts and moved logs to block the gap in the "wall" near the gate; Ian put a new hasp on the barn door
6

any necessary repairs

Upper Pond Raft
7
Repair and resurface; build ladder

Clear the trails!

6/20: Mike & Ian cleared the Red Triangle trail with chainsaw, brushcutter and loppers and renewed trail blazes
8
clear all trails; clear around upper pond; clear old stage road
Lower Pond Dock
fix ramp; stake dock securely
Lay in Firewood
Cut, transport, split, stack, cover
Propane Shower
Mount showerhead arm
Info board
paint; shingle roof with overhang; add pen holder
Ridge Trail Blocks
Put fence across ridge trail access
Road Maintenance
remove obstructions
Waterseal Barn
waterseal the outside
Garden
Even out ground surrounding garden; add topsoil, plant grass; whack weeds
Repair/Replace the storage Shed
waterseal the outside
Get the jack pump working
Finish repairs; dig pipe trench; mount
Gazebo
build a portable, multi purpose gazebo
Rope Swing
Rig a rope swing on one of the ponds
Victorian Water Slide
Build a Victorian Water slide
Misc.

 

back to top


2008: I'd like to do at least 2 Work Weekends (6 people minimum)
Who
7/12-13
7/26-27
Notes
(Wil & Chris Dowell & dogs are likely to be there)
(Wil & Chris Dowell & dogs will NOT be there)
 
6
4
Ian Dowell
YES
YES
Anne Dowell
YES
Morton, Sarah & Haggis
Julien Lafleur
YES
YES
Anne & Sage Lafleur
YES
Mike & Alex Guenette
YES
Todd Radford and Dana Ozik
Meryl Brott & Kevin Shanahan
YES
Project

Accomplished 2008

Priority
To Do
Field Maintenance

7/12-13: Chris mowed the fields; Ian brush mowed the parking area, lower pond approach & field edge

1

Cut grass; whack weeds
-parking areas
-barn front
-garden
-central area
-dancing meadow
-upper field
-lower field

-latrine paths

Upper Deck Tarp

7/12-13: Julien, Meryl & Kevin deployed the tarp: it's still in working order

2
retractable deck tarp frame
Upper Pond Dock
7/12-13: Ian painted the new ladder
3

any necessary repairs

Latrine maintenance

7/12-13: Mike & Kevin scouted locations fore the new Barn Latrine

4
Clean; repair tarps, splash boards; muck trenches; repair trails to latrines
Barn

7/12-13: Merly, Kevin, Julien, Mike & Alex cleaned and vacuumed 2nd & 3rd levels

5
Organize and clean as necessary. Reapair door; add door gap overlaps
Upper Pond Raft
6
Repair and resurface; build ladder
Lower Pond Dock
fix ramp; stake dock securely

Clear the trails!

7/12-13: everyone did two days of hard work clearing the 4 major trails and 2/4 minor trails with brush mower, chain saw, loppers and restored the trail blazes
clear all trails; clear around upper pond; clear old stage road
Lay in Firewood
Cut, transport, split, stack, cover
Propane Shower
Mount showerhead arm
Info board
paint; shingle roof with overhang; add pen holder
Ridge Trail Blocks
Put fence across ridge trail access
Road Maintenance
remove obstructions
Waterseal Barn
waterseal the outside
Garden
Even out ground surrounding garden; add topsoil, plant grass; whack weeds
Repair/Replace the storage Shed
waterseal the outside
Get the jack pump working
Finish repairs; dig pipe trench; mount
Gazebo
build a portable, multi purpose gazebo
Rope Swing
Rig a rope swing on one of the ponds
Victorian Water Slide
Build a Victorian Water slide
Misc.

 

back to top

2007: I'd like to do at least 2 Work Weekends (6 people minimum)
Who
6/16-17
6/30-7/1
7/14/15
Notes
(Wil & Chris Dowell & dogs are likely to be there) Weekend before MSF (Chris & dogs possibly there)
 
7
5
1
Ian Dowell
YES
YES
YES
Anne Dowell
YES
YES
Morton, Sarah & Haggis
Julien Lafleur
YES
YES
Anne & Sage Lafleur
YES
Mike Guenette
YES
Carla, Elisabeth & Alex Guenette
Todd Radford and Dana Ozik
YES
Meryl Brott & Kevin Shanahan  
YES
Project

Accomplished 2007

Priority
To Do
Field Maintenance

6/16-17: Dana mowed the lower and upper fields, central area, parking lots and barn area; Mike performed extensive lawn mower repairs; Julien whacked around barn, garden and central area

6/30-7/1: Ian did more weed whacking

1

Cut grass; whack weeds
-parking areas
-barn front
-garden
-central area
-dancing meadow
-upper field
-lower field

-latrine paths

Upper Deck Tarp

6/16-17: Todd, Dana, Mike, Julien & Ian started the retractable deck tarp frame project - frames have been built and installed and supplied purchased;

6/30-7/1: Julien, Jerry, Jan & Ian got version 1 of the deck tarp up

2
retractable deck tarp frame
Upper Pond Dock
3

any necessary repairs

Latrine maintenance

6/30-7/1: Meryl & Kevin cleaned, moved and refurbished the barn and upper pond latrines

4
Clean; repair tarps, splash boards; muck trenches; repair trails to latrines
Upper Pond Raft
6/16-17: Todd & Dana tightened up the ropes
5
Repair and resurface; build ladder
Lower Pond Dock
fix ramp; stake dock securely

Clear the trails!

clear all trails; clear around upper pond; clear old stage road
Lay in Firewood
Cut, transport, split, stack, cover
Barn

6/16-17: Anne, Anne, Dana & Todd cleaned and organized; Todd, Dana & Ian installed safety nets on stairs

6/30-7/1: Anne, Meryl & Kevin cleaned, organized and inventoried; Kevin & Meryl cleaned and filled lanterns and tiki torches

Organize and clean as necessary. Reapair door; add door gap overlaps
Propane Shower
6/30-7/1: Ian hooked up propane shower; Meryl & Anne scouted locations in the central area
Mount showerhead arm
Info board
paint; shingle roof with overhang; add pen holder
Ridge Trail Blocks
Put fence across ridge trail access
Road Maintenance
remove obstructions
Waterseal Barn
waterseal the outside
Garden
Even out ground surrounding garden; add topsoil, plant grass; whack weeds
Repair/Replace the storage Shed
waterseal the outside
Get the jack pump working
Finish repairs; dig pipe trench; mount
Gazebo
build a portable, multi purpose gazebo
Rope Swing
Rig a rope swing on one of the ponds
Victorian Water Slide
Build a Victorian Water slide
Misc.

 



I'd like to do 2 July Work Weekends (6 people minimum)
Who
5/29-5/30
7/15-7/16
7/22-7/23
Notes
   
 
5
3.5
Ian Dowell
YES
YES
YES
Anne Dowell
YES
YES
Morton, Sarah & Haggis
Eva Beuling
YES
Julien, Anne & Sage Lafleur
YES
YES
Cinda Lavely & Jeremy Nimmer
YES
Mike & Elisabeth Guenette
YES
Carla & Alex Guenette
Todd Radford and Dana Ozik  
YES
Meryl Brott & Kevin Shanahan  

back to top


Projects for 2006:

    Project

    Accomplished

    Priority
    To Do
    Field Maintenance

    7/15-16: Dana, Todd & Julien mowed; Ian & Todd weed whacked; Todd, Dana, Julien & Ian cleared & moved fallen trees

    1

    Cut grass; whack weeds
    -parking areas
    -barn front
    -garden
    -central area
    -dancing meadow
    -upper field
    -lower field

    -latrine paths

    Upper Pond Dock
    7/15-16: Todd fixed the buckled boards
    2
    any necessary repairs
    Latrine maintenance

    7/15-16: Ian cleaned the upper latrine; Todd, Dana, Julien & Ian cleared & moved upper latrine and lined path

    3
    Clean; repair tarps, splash boards; muck trenches; repair trails to latrines
    Upper Pond Raft
    7/15-16: Todd, Dana & Julien refurbished the surface and supports
    4
    Repair and resurface; build ladder
    Lower Pond Dock
    5
    fix ramp; stake dock securely
    Upper Deck Tarp
    6
    rig roll-out tarp

    Clear the trails!

    7
    clear all trails; clear around upper pond; clear old stage road
    Lay in Firewood
    8
    Cut, transport, split, stack, cover
    Repair Weathervane
    7/15-16: Todd & Julien removed and replaced the weathervane and corrected the E/W directionals; Steve Kondi soldered the broken pieces back on
    9
    take down weathervane, correct compass, fix owl, fix CR
    Barn

    7/15-16: Anne & Anne cleaned and organized

    10
    Organize and clean as necessary. Reapir door.
    Propane Shower
    11
    Mount showerhead arm
    Info board
    12
    paint; shingle roof with overhang; add pen holder
    Ridge Trail Blocks
    13
    Put fence across ridge trail access
    Road Maintenance
    7/15-16: Todd, Dana, Julien & Ian cleared obstructions from road
    waterseal the outside
    Waterseal Barn
    waterseal the outside
    Garden
    7/15-16: Ian & Todd whacked weeds
    Even out ground surrounding garden; add topsoil, plant grass; whack weeds
    Repair/Replace the storage Shed
    waterseal the outside
    Get the jack pump working
    Finish repairs; dig pipe trench; mount
    Gazebo
    build a portable, multi purpose gazebo
    Rope Swing
    Rig a rope swing on one of the ponds
    Victorian Water Slide
    Build a Victorian Water slide
    Misc.
    7/15-16: Ian fixed the rain barrel; Todd & Ian hung the bat

back to top

 


Projects for 2005:

    Project

    Accomplished

    Priority
    To Do
    Field Maintenance

    6/26/05: Ian & Morton fixed the mower (twice). Ian & Eva stocked up on gas. Eva whacked weeks. Sarah, Gavin & Karen mowed the fields.
    7/16-17 mowed fields

    1

    Cut grass; whack weeds
    -parking areas
    -barn front
    -garden
    -central area
    -dancing meadow
    -upper field
    -lower field

    -latrine paths

    Combat Beavers

    2
    Unclog pond outlets as necessary; build wire fence to keep beavers away;
    Latrine maintenance

    6/26/05: Anne worked on the Barn latrine
    7/16/05 Julien & Elisabeth cleaned up, cleared and stocked the latrines
    7/17/05 Mike & Ian dug a new trench for the Barn latrine.

    3
    Clean; repair tarps, splash boards; muck trenches; repair trails to latrines
    Lower Pond Dock
    4
    fix ramp; stake dock securely
    Upper Pond Dock
    5
    any necessary repairs
    Upper Pond Raft
    6
    Repair and resurface; build ladder
    Barn

    6/26/05: Anne D.took inventory of cooking implements. Ian and Morton made a temporary fix to the barn door which had come off the hinges. Gavin hauled up the new grill
    7/16/06 Anne L. swept up the 2nd level

    7
    Organize and clean as necessary. Reapir door.
    Info board
    8
    paint; shingle roof with overhang; add pen holder
    Upper Deck Tarp
    9
    rig roll-out tarp

    Clear the trails!

    10
    clear all trails; clear around upper pond; clear old stage road
    Lay in Firewood
    6/26/05: Morton and Ian removed fallen timber from the road and cut up additional timber. Morton and Eva hauled the logs to the barn.
    11
    Cut, transport, split, stack, cover
    Ridge Trail Blocks
    Put fence across ridge trail access
    Waterseal Barn
    waterseal the outside
    Garden
    Even out ground surrounding garden; add topsoil, plant grass; whack weeds
    Propane Shower
    Mount showerhead arm; repair shower
    Repair/Replace the storage Shed
    waterseal the outside
    Repair Weathervane
    take down weathervane, correct compass, fix owl, fix CR
    Get the jack pump working
    Finish repairs; dig pipe trench; mount
    Gazebo
    build a portable, multi purpose gazebo
    Rope Swing
    Rig a rope swing on one of the ponds
    Victorian Water Slide
    Build a Victorian Water slide

back to top


Projects for 2004:

    Project

    Accomplished

    Priority
    To Do
    Field Maintenance

    5/29-30: Ian & Mike repaired mowers, trimmer, mantis & generator; mowed upper field with the push mower, dancing meadow, garden, barn front
    5/31: Wil & Chris mowed the lower field with the push mower

    Chris mowed fields
    7/17 Bill G. weed wacked field borders, paths, mowed parking areas

    1

    Cut grass; whack weeds
    -parking area

    -barn front
    -garden
    -central area
    -dancing meadow
    -upper field

    -lower field

    Combat Beavers

    5/23: Ian unclogged pond outlets of beaver debris
    Chris D. unclogged outlets

    2
    Unclog pond outlets as necessary; build wire fence to keep beavers away;
    Latrine maintenance

    7/17: Anne L. & Elisabeth inspected, Bill G. weedwhacked
    Chris D. cleared fallen tree

    3
    Clean; repair tarps, splash boards; muck trenches; repair trails to latrines
    Lower Pond Dock
    4
    fix ramp; stake dock securely
    Upper Pond Dock
    7/17: Ian removed wasp nest and renailed step board
    5
    Fix loose cross piece
    Upper Pond Raft
    7/17: Ian & Bill G. replaced leaking barrel and hammered in loose nails
    6
    Repair
    Barn
    7/17: Anne L. directed cleanup of 2nd and 3rd levels with help of Elisabeth, Julien, Carol, Mike; Julien & Mike fixed up pews; moved one pew section to 1st level
    7
    Organize
    Info board
    7/17: Mike built with help from Ian & Julien
    8
    build sheltered info board with chalk board, cork board, plexi shield, roof, removeable
    Upper Deck Tarp
    9
    rig roll-out tarp

    Clear the trails!

    10
    Clear Yellow Diamond (initial), White Diamond (repair), White Triangle (initial - new), Yellow Diamond (initial) and Yellow Triangle (initial - new) trails; clear around upper pond; clear old stage road
    Lay in Firewood
    11
    Cut, transport, split, stack, cover
    Ridge Trail Blocks
    Put fence across ridge trail access
    Waterseal Barn
    Wil, Marjolijn & Eva B. watersealed 2nd floor deck floor
    waterseal the outside
    Garden
    7/17: Bill G. weedwhacked around garden
    Even out ground surrounding garden; add topsoil, plant grass; whack weeds
    Propane Shower
    Mount showerhead arm
    Repair/Replace the storage Shed
    waterseal the outside
    Repair Weathervane
    take down weathervane, correct compass, fix owl
    Get the jack pump working
    Finish repairs; dig pipe trench; mount
    Gazebo
    build a portable, dual purpose gazebo
    Rope Swing
    Rig a rope swing on one of the ponds
    Victorian Water Slide
    Build a Victorian Water slide

back to top


Projects for 2002:

    Project

    Accomplished

    Priority
    To do
    Latrine maintenance
    6/29-30: Gavin dug a new latrine by the cabin
    7/6-7: Anne cleared, cleaned and refreshed the upper and barn latrines
    7/13-14: Anne & Jacqueline finished the cleaning and refurbishing of latrines; Anne & Ian did additional landscaping, including adding a platform outside the upper latrine
    1
    Clean; repair tarps, splash boards; muck trenches; repair trails to latrines
    Build a new Dock

    6/22-23: Sarah, Morton, Jason & Chris hauled out the old docks, attached the new dock to the deck, determined it needs support posts, designed a plan to salvage old dock material
    7/6-7: Ian, Jason, Anne & Sarah attached legs and installed the new dock

    2
    mount barrels in frame, reinforce frame, attach frame to Deck; Possible second Dock segment

    Clear the trails!

    6/29-30: Ian bulldozed the orange diamond trail; Ian, Anne, Mike & Joceline did light clearing on the Yellow Diamond and Yellow Triangle trails. Mike & Ian started on the upper pond.
    7/13-14: Ian did more work clearing trail around the upper pond
    3
    Clear Yellow Diamond (initial), White Diamond (repair), White Triangle (initial - new), Yellow Diamond (initial) and Yellow Triangle (initial - new) trails; clear around upper pond
    Propane Shower
    4
    Mount showerhead arm
    Organize the Barn
    6/22-23: Anne directed clean-up from winter damage and wear; Cinda, Sarah, Morton & Jason helped clean and organize
    5
    clean and organize all levels;
    Repair/Replace the storage Shed
    6
    waterseal the outside; put wire around bottom to keep out porkies
    Fix the Barn drainage/access
    6/29-30: Ian had gravel delivered & used heavy machinery to move it inside barn. Mike, Anne, Elisabeth & Joceline raked it even. Anne, Mike, Joceline & Elisabeth moved everything out of the first level of the barn. A, I, M, E, J sorted through it and moved most of it back in organized and cleaned.
    7
    Have gravel delivered and spread inside barn
    Get the jack pump working
    Finish repairs; dig pipe trench; mount
    Field Maintenance

    6/1-2: Wil & Chris mowed fields
    6/29-30: Chris & Diane mowed the fields.
    7/13-14: Steve M. weedwhacked along lower pond edge, and lower field edge; Wil, Judy & Anne raked; Ian whacked along upper field edge

    Cut grass; whack weeds
    Lay in Firewood
    7/13-14: Ian chopped up and stacked long firewood by wood pile
    Cut, transport, split, stack, cover
    Clear Deadfalls 6/22-23: Ian, Anne, Sally & Chris tooke down the large poplar branch which fell across the road last fall; cut up for firewood
    7/13-14: Ian cut up the big deadfall across the latrine trail
      Remove fallen trees
    Garden
    6/22-23:Cinda weeded the garden and started working on the oval at the side of the barn;
    6/29-30: Ian weed-whacked the area around the garden & cut a few overhangs
    7/6-7: Cinda worked on the garden
    Even out ground surrounding garden; add topsoil, plant grass; whack weeds
    Odds & Ends 6/22-23:Jason cleared sticks & debris from road; Chris & Wil brought up Chruch pews; Ian, Anne, Sally, Chris, Chris & Wil hauled them in to barn;
    6/29-30: Ian moved gravel down to the lower pond outlet; Ian & Wil raked it smooth; Ian, Anne & Joceline raked the disturbed gravel in front of the barn; Wil raked the divots in the road left from the machinery. Chris & Ian worked on the deck of the Shack; Chris, Wil & Gavin worked on the Dock of the Shack. Wil build a fireplace at the Shack.
    7/6-7: Ian & Jason erected 3 standing stones
    7/6-7: Sarah fixed the screen door on the 1st floor of the cabin
    7/13-14: Jacqeuline & Ian replaced two barrels on the upper raft & anchored the raft in the middle of the pond
    7/13-14: Anne, Jacqueline & Ian cleared brush & scrap wood from the central area and put a new top on the picnic table

      Stabilize dock on lower pond; fix road; put new top on deck table; add rain barrel under gutter;
    Combat Beavers
    6/22-23: Ian unclogged upper and lower pond outlets where beavers have repeatedly dammed up the flow and threatened to wash out the dams
    6/29-30: Ian unclogged upper & lower pond outlets
    7/1: Chris put wire cages around pond outlets
    Unclog pond outlets as necessary; build wire fence to keep beavers away;

Projects for 2001:

     

    June 16-17
    Bill Helfinstine, Cinda Lavely, Eric Lindblad, Ian Dowell, Jacqueline Grieve, Jacqueline Taylor, Jason Rolfe, Meryl Brott, Sally Burke, Sarah Culgin

    To do  

    Clear the trails!

    Cleared (initial clearing) Orange Diamond and Red Triangle trails 7. Clear Yellow Diamond (initial), White Diamond (repair), White Triangle (initial - new), Yellow Diamond (initial) and Yellow Triangle (initial - new) trails  
    Build a new Dock Assembled frame and decking 1. Get barrels, mount in frame, reinforce frame, attach frame to Deck; Possible second Dock segment  
    Repair/Replace the storage Shed Took off roof, cleared out interior, built new shed frame/roof 2. Take apart the rest of the old Shed, use metal for sides/roof of new Shed  
    Fix the Barn drainage/access Put wire/gravel around base of Barn 8. Spread remaining gravel around area in front of Barn  
    Finish the shower   4. Mount shower curtain hardware  
    Refurbish/repair barbecue grill Cut out grill from base 10. Fix up and mount base, if possible  
    Latrine maintenance   3. Clean; repair tarps, splash boards; muck trenches  
    Refurbish the Deck   5. Repair/replace seats  
    Organize the Barn Cleared out/organized 1st level; swept 2nd level; added carpet and couch/bed frame to 3rd level; added theater seats to 2nd level 6. Deal with stuff from Shed; organize 2nd & 3rd levels  
    Get the jack pump working   9. Finish repairs; dig pipe trench; mount  

back to top